The Sharp Group started work on the Little Grassy River Bridge, North of Hwy 600, located next to the Bergland Store commencing on July 14th, 2014. The timber pile with wooden deck, double-lane bridge was replaced with a new 100' double-lane Mabey Modular Bridge. A detour route was required during this construction. Final paving was completed in August, 2014, ahead of schedule.