Posted by Sharp Bridges on Wednesday, March 30, 2016
Two bridges located north of Ignace on Hwy 599 were installed. An open bottom arch bridge was installed at Elbow Creek and a 72 ft. Box Beam Concrete structure was installed at Sturgeon River. This project began in June, 2015 and was completed on-time in October, 2015.