The aging culvert located on Hwy 600, west of Hwy 621, near Bergland, Ontario required replacing. Three galvanized pipe culverts were replaced with a precast culvert structure. It was critical to meet the road closure deadline of 6 days, since the detour was long. The Sharp Group was able to complete this job in the time allotted.