Bridge repairs were done on the Pic River Hydro Dam Bridge in White River, Ontario in June, 2015.  This time sensitive project saw the replacement of the bridge with a 100 & 110 ft. permanent structures with 3 temporary works.  Project was completed in a 3 week time frame.  The temporary structure will be removed in March.