Two bridges located north of Ignace on Hwy 599 were installed.  An open bottom arch bridge was installed at Elbow Creek and a 72 ft. Box Beam Concrete structure was installed at Sturgeon River. This project began in June, 2015 and was completed on-time in October, 2015.