The Sharp Group commenced work on removing and replacing this structure in early May of 2019. The structure is located on Sturgeon Creek Road in Chapple Township (Barwick, On). The existing structure was removed and replaced with a 27.2 meter, single span, concrete box girder, with cast in place deck. Work was completed at this site mid July 2019.